
Testing rig for scissor lift
We installed an endurance testing rig to give a proof of the capability of our scissor lifts.
On the testing rig, a 15-tons scissor lift was subjected a test cycle under full workload. The test cycle simulated the equivalent of at least 30 years of operating time in the required production rate.
