
Unloading devices
Our contract included the design, manufacturing and installation of two almost identical unloading devices, which withdraw frames from a telpher.
Special demands in this case were the integration in an existing rail system with default dimensions, by simultaneously extending the movement range. Equally a variable adjustment related to the cycle speed of the telpher had to be realized.
